The Life Cycle Model
The Banks Integration Group is committed to outstanding documentation, methodology, and processes. All projects begin with completion of a Project Quality Plan, which documents the approach taken on a project, defines the deliverables, assigns responsibility to each project tasks and ultimately aids in the successful completion of the project. Projects are executed following extensive in-house procedures derived from the GAMP 4 Life Cycle Development Model.

Quality System |
- SOP001 Issue and Control of Procedures
- SOP002 Issue and Control of Documentation
- SOP003 Preparation of Project Quality Plans
- SOP004 Production of Project Schedules
- SOP005 Production of User Requirements Specifications
- SOP006 Production of Functional Specifications
- SOP007 Production of Hardware Design Specifications
- SOP008 Production of Software Design Specifications
- SOP009 Programming Practices
- SOP010 Production of Software Module Test Specifications
- SOP011 Production of Hardware Test Specifications
|
- SOP012 Production of Software Factory Test Specifications
- SOP013 Production of Acceptance Test Specifications
- SOP014 Production of Maintenance Specifications
- SOP015 Training Procedure
- SOP016 Audit Procedure
- SOP017 Production of Software Module Design Specifications
- SOP018 System Complaint Handling
- SOP019 Issue and Control of Software
- SOP020 Archiving, Backup and Recovery of Software and Data
- SOP021 Configuration Management
- SOP022 General Test Instruction
- SOP023 Deviation Reporting
|
|